Nazaré, Portugal · 2014 and 2021 · Single opening press
Realignment after a fire in the plant
TaskRealignment of the rebuilt machine after two separate fires in the plant — two assignments in 2014 and 2021, each before the installation of a new belt.
ResultAfter the first alignment the machine went straight into production, with very satisfactory belt tracking from the start. Following the second fire the customer therefore requested the same measurement assignment again, which was carried out to their complete satisfaction.
Time savedAfter a rebuild, the position of the components relative to one another is unknown. Without a survey the only option is to correct belt tracking step by step during operation — in my experience two to four weeks.